top of page

Wind Farm Bat Surveys

At Dr Bat, we specialise in bat surveys for wind-farm developments. With years of hands-on experience surveying New Zealand’s bats, including the critically endangered Long‑tailed Bat (Chalinolobus tuberculatus), you’ll benefit from professional, science-based advice without extensive layers of consultants or inflated fees.

What we cover

1. Pre-construction bat risk assessment

We conduct habitat mapping, deploy full-spectrum and AR4 detectors across proposed turbine sites, and use thermal imaging, drones, and seasonal analysis to design evidence-based recommendations for turbine placement and lighting mitigation.

2. Operational monitoring and adaptive management

We perform post-construction acoustic monitoring and data analysis to detect bat activity patterns, evaluate collision risk, and provide tailored advice on curtailment, lighting, and deterrent strategies.

3. Reporting you can use

We deliver clear, defensible reports with maps, metadata, and summaries aligned with consent requirements—offering fast turnaround and direct communication without corporate delay.

Why choose Dr. Bat?

I’m DOC-accredited, field-tested, and science-based — not a marketing department in sight. No buzzwords, no bureaucracy, just good data and straight answers about bats and wind farms.

 

While the big firms talk in circles, I’m already out there at sunset setting up detectors. Because when it comes to bat surveys, experience and evidence beat fancy PowerPoints every time.

IMG_7164 (1)_edited.jpg

True specialist in the field

I personally design, deploy and analyse the surveys like I've been doing throughout my PhD — no subcontracting through multiple layers.

IMG_0027.jpeg

Proven in NZ wind-energy context

I’ve worked with numerous proposed wind-farm sites, applying accepted best-practice methods and recent guidance from the Department of Conservation and global research.

IMG_1394.JPG

Full technical capability

I own and deploy a range of equipment (acoustic recorders, thermal imaging, drone, 4WD) so you can trust comprehensive data support when it matters most.

578f4e5a-84e6-4415-8d61-0bb72d7c827b.jpg

Streamlined and cost-effective

As a small operator, I offer quicker turnaround, flexible scheduling and lower overhead — so you get high-quality results at great value.

Wind Turbines in the Mountains

Clear results, ready to support consent

My methodology is science-based, and my reports are defensible and aligned to best-practice guidance for bat-wind-farm risk assessment and monitoring

bacc1ab7-baec-4491-8ff0-dca441ded698.jpg

DOC-accredited and science-based

I’m fully DOC-approved for bat work and focus on evidence, not marketing spin — real data, real bats, and recommendations you can actually use.

Why this work matters

Wind-farm infrastructure presents special risks for bats — especially small, vulnerable, and long-ranging species like the Long-tailed Bat. These risks include collision, barotrauma, and disturbance of roosts or foraging routes. 

By conducting robust survey work now, you not only meet consent obligations — you also make sound ecological decisions, minimise risk, and support biodiversity outcomes.

bat logo transperant_edited.png
bottom of page